Borkum Riffgrund 2

LOKATION

-

KLIENT

DONG Energy Wind Power

BYGGEÅR

2014-2016

PARTNERE

-

The Borkum Riffgrund 2 offshore wind farm will be located 38 km North of the German island of Borkum, adjacent to the existing Borkum Riffgrund 1. Borkum Riffgrund will have a final output of 450 MW.

The Borkum Riffgrund 2 topside is designed by ISC as a multi-story beam/bracing type steel structure with five decks, including a cellar deck positioned on the top of the jacket structure for cable pulling and cable hang-off. The enclosed areas are constructed as lightweight panel walls as opposed to the more common stress skin type. A helicopter deck is placed on the west side of the substation allowing for access by helicopter.

Located in a water depth of 27 meters, the topside is supported by a four legged lattice jacket that is able to support 12 J-tubes for array cables and 2 J-tubes for export cables.