LOCATION

-

CLIENT

-

BUILDING PERIOD

-

PARTNERS

-

The Blight Bank Phase II offshore wind farm is located in the Belgian sector, 45km from the coast of Zeebrugge. The offshore substation enables 165MW of clean energy.

The Blight Bank Phase II topside is designed as a multi-story steel structure with five decks, including a cable deck for cable pulling and cable hang-off.

A winch area is placed on roof deck of the substation allowing winching operations by a helicopter. The total weight of the topside structure is 970 tons.

Watch the video – Load out skidding of Blight Bank II, Nobelwind topside here

LOCATION

-

CLIENT

-

BUILDING PERIOD

-

PARTNERS

-


Viborg banebro

ISC Rådgivende Ingeniører A/S har i samarbejde med Cubo Arkitekter, Møller & Grønborg A/S,  Dansk Energimanagement & Esbensen A/S samt specialkonsulenterne Frie Jernbanekonsulenter og Niras projekteret Viborg baneby og gymnasium.

Dalbro - Tvis Å

Dalbro – Tvis Å

I sommeren 2015 vandt ISC/Per Aarsleff opførelsen af Dalbroen over Tvis Å i totalentreprise. Broen er en del af Vejdirektoratets igangværende motorvejsbyggeri på strækningen Herning-Holstebro.

TP30 Ringstedbanen

ISC har projekteret Danmarks første komposit jernbanebro. Broen er en 512 meter lang jernbanebro og en del af Banedanmarks nye højhastighedsbane mellem København og Ringsted.

Odins Bridge

The new bridge crossing the Odense Canal on the island Funen Denmark is named Odins Bridge. Odin was a god in Nordic mythology and was the name giver to the city Odense. The bridge has closed a long missed gap in the infrastructure of the road system surrounding Odense which is the third largest city in Denmark.

6 Bridges To The Island Of The New OPera House, CPH

The Dock Island by the Naval Shipyard used to belong to the Danish Naval Fleet. In connection with the plan for locating the new Opera House, the Dock Island was separated from the adjacent islands called the South Island and the North Island by 2 artificial canals.

North River Bridge, Thule

The new North River Bridge is supposedly the most northerly built bridge of that size at the latitude of 77°. The bridge with 60 m span crosses the North River, which runs parallel with the runway in Thule Airport. The bridge replaces a shorter 23 m span truss bridge, which was destroyed during a flood in the autumn of 2001.

Viborg banebro

ISC Rådgivende Ingeniører A/S har i samarbejde med Cubo Arkitekter, Møller & Grønborg A/S,  Dansk Energimanagement & Esbensen A/S samt specialkonsulenterne Frie Jernbanekonsulenter og Niras projekteret Viborg baneby og gymnasium.

Dalbro - Tvis Å

Dalbro – Tvis Å

I sommeren 2015 vandt ISC/Per Aarsleff opførelsen af Dalbroen over Tvis Å i totalentreprise. Broen er en del af Vejdirektoratets igangværende motorvejsbyggeri på strækningen Herning-Holstebro.

TP30 Ringstedbanen

ISC har projekteret Danmarks første komposit jernbanebro. Broen er en 512 meter lang jernbanebro og en del af Banedanmarks nye højhastighedsbane mellem København og Ringsted.

Odins Bridge

The new bridge crossing the Odense Canal on the island Funen Denmark is named Odins Bridge. Odin was a god in Nordic mythology and was the name giver to the city Odense. The bridge has closed a long missed gap in the infrastructure of the road system surrounding Odense which is the third largest city in Denmark.

6 Bridges To The Island Of The New OPera House, CPH

The Dock Island by the Naval Shipyard used to belong to the Danish Naval Fleet. In connection with the plan for locating the new Opera House, the Dock Island was separated from the adjacent islands called the South Island and the North Island by 2 artificial canals.

North River Bridge, Thule

The new North River Bridge is supposedly the most northerly built bridge of that size at the latitude of 77°. The bridge with 60 m span crosses the North River, which runs parallel with the runway in Thule Airport. The bridge replaces a shorter 23 m span truss bridge, which was destroyed during a flood in the autumn of 2001.

Bus Maintenance Centre Ballerup

The bus maintenance centre located in Ballerup north of Copenhagen, has a capacity to handle and park approx. 80 busses. The building comprises of a bus maintenance shop, bus cleaning facilities, a storage, an administration and canteen building and a centre hall, all of them including a basement.

Sundsvall Bridge

The Sundsvall Bridge crosses the Sundsvall Fjord with a total length of 1,420 m as part of the new eastern highway in Sweden. The contract was won in a European competition, by PBM Joint Venture with ISC Consulting Engineers A/S as designers for the bridge superstructure.

CPH CSC Phase II

Projektet CSC Phase II indgår som et centralt element i CPH´s vækstplan Expanding CPH, der skal sikre kapacitetsforøgelse fra nuværende 25mill passagerer frem mod 40mill passagerer årligt.