• Location: The Baltic Sea
  • Capacity: 1.2 GW
  • Installation: Expected 2026
  • Water Depth: 33-45 meters
  • Substructure: Monopile
  • Detailed Design: Substructure & Topside
  • Client: Bladt/Semco
  • Owner: Baltic Power

1.5 million homes powered with clean energy in Poland 

Baltic Power will consist of 76 wind turbines and have a capacity of 1.2 GW which will translate into sustainable energy for approximately 1.5 million households in Poland. 
The wind farm is expected to be operational in 2026 with construction starting in 2024. The farm will occupy an area of over 130 km2, approx. 23 km north of the Baltic Sea coastline, near Łeba and Choczewo. 

Full detailed design of topside and substructure 

We are doing full detailed design of the two identical offshore substations that will be part of the offshore wind farm. Monopiles are chosen as substructures. Furthermore we have done piping, proces, and fire & safety. 

Follow the Baltic Power project here: Baltic Power