Baltica 2
The Baltica Offshore Wind Farm, with a total capacity of up to 2.5 GW, will be developed in two stages: Baltica 2, with an approximate capacity of 1.5 GW, and Baltica 3, with an approximate capacity of 1 GW.
Baltica 2 will have 100 wind turbines and 4 offshore substations. It is expected to be fully operational in 2027.
Full detailed design
We have carried out the full detailed design of the topsides and Modular Support Frame for the four substations. The substations will each weigh 2800 tons and be placed at a water depth of 32-47 meters
Location
The Baltica Offshore Wind Farm will be developed in the Polish part of the Baltic Sea between Łeba and Ustka. The distance from the closest wind turbines to the shore will be approximately 40 km