• Location: The Dutch North Sea
  • Capacity: 120 MW
  • Installation: 2007
  • Topside Weight: 650 tonnes
  • Water Depth: 24 meters
  • Substructure: Monopile
  • Detailed Design: Topside
  • Client: Eneco/Bladt

Princess Amalia

The offshore substation allows the sending 120 MW of sustainable energy to shore. The Princess Amalia topside is designed as a multi-layer steel structure with five decks, including a cable cover for cable routing and cable suspension. 

Services provided by ISC

• Concept FEED, Layout Arrangement followed by detailed design of complete substation topside including auxiliary systems. 

• Complete detailed engineering design in place, sea transport, installation, and lift to topside. 

• Fire safety 

• Process, Piping & Mechanical 

Project follow-up and installation 

• Certificate packages for Topside for DNV-GL verification. 

• Supplementary information and KPI.