Location:

South West of South Korea

Capacity:

523 MW

Installation:

Expected 2027

Water Depth:

20 meters

Substructure:

Jacket

Detailed Design:

Topside & Jacket

Client:

HBA Future Energy

One of South Korea's first offshore wind farms

Anma Offshore Wind is expected to provide power to more than 1.4 million South Koreans annually. The wind farm is part of South Korea's plan for carbon neutrality by 2025.

Anma is a 532MW wind farm project located 40 km west of the South Korean peninsula’s southwestern coastline. The project site is positioned next to Anma Island in the Yeonggwang-gun.

Detailed design of topside & jacket

We have done the full detailed design of the topside and substructure for the Anma substation. The wind farm is expected to be fully operational in 2027.

Follow the project here: https://anmawind.com