• Location: German Baltic Sea
  • Capacity: 247 MW
  • Installation: 2022
  • Topside Weight: 2200 tons
  • Water Depth: 43,7 meter
  • Substructure: MP/TP
  • Detailed Design: Topside
  • Client: Parkwind OST Gmbh

Green Energy for 300,000 Households 

The Arcadis Ost 1 project will have a capacity of 247 MW and be able to deliver sustainable power to approximately 300.000 German households. 

Full Detailed Design of Topside 

We have delivered the full detailed design for the topside structure of the substation. The Arcadis OST 1 can deliver 247 MW of low-cost produced, sustainable power. We have been in charge of the full range of engineering disciplines for the substation. 

General Description of the Project The offshore wind farm is located in the German Baltic Sea, around 19 km from the island of Rugen. The topside will be supported by a jacket on a water depth of 43.7 meters.
ISC is a sub-contractor to Bladt Industries and will deliver the engineering disciplines for the substation.