Location:

Taiwan Strait

Capacity:

500 MW

Installation:

Expected 2026

Topside Weight:

3,200 tonnes

Water Depth:

53-60 meters

Detailed Design:

Topside

Client:

Semco Maritime

Feng Miao

The Feng Miao Project is located approximately 36 kilometers off the coast of Taichung City on the Taiwanese West coast. It will have a capacity of 500 MW and is expected to be commissioned by 2026.

Full detailed design of topside

We have carried out the full detailed design of the topside for the offshore substation.