Thisted Combined Heat and Power Plant
The project consisted of constructing a new boiler hall for 2 x 10 MW straw-fired boiler units and two associated straw storage facilities for Thisted District Heating at Flintborgvej in Thisted.
The halls were built as a single, cohesive structure located on an adjacent plot to the existing straw-fired facilities and heat exchanger building. The new construction has a total built-up area of approx. 5,500 m² and is primarily constructed as a single-storey building, with the exception of intermediate floors in the boiler building.
The total floor area is approx. 5,700 m².
The mechanical project was tendered and executed separately from the building contract as a design-and-build contract, though with close cooperation and coordination during the execution phase.
Role of the Consultant
Consultancy in the following phases (PAR/FRI YB B&L 2018):
- ICT management
- Authority (compliance) project
- Tender project
- Execution project
- Project follow-up during construction and handover
- Technical site supervision during construction and handover
Engineering Services
- Structural Engineering
- Load-bearing structures
- Concrete foundations
- Steel structures
- Precast concrete walls and floor slabs
- Certified structural engineer, KK3
Technical Installations
- Underground utilities
- Plumbing
- Ventilation and cooling
- Electrical installations
Civil Works
- Soil calculations and excavation plans
- Pavement and surface works
Other Special Services
- 3D scanning/point cloud of existing buildings and installations
- Hot-water pipes to existing heat exchanger building
Additional Information
- Inclusion of user groups in the design process
- Designed in accordance with BR18